HVDC Italy-Greece
The HVDC Italy-Greece is a monopolorar sea cable link between Italy and Greece with a maximum transmission rate of 500 megawatts, which went in service in 2001. The HVDC Italy-Greece begins in the static inverter plant Galatina in Italy and is implemented in its first 40 kilometers as underground cables. Then it crosses the Adria as a 160 kilometer long submarine cable. In Greek the line is implemented in the last 110 kilometers of its track to the static inverter station in Arachthos as overhead line.
External links
|
|