![]() |
![]() |
|
![]() |
![]() |
Encyclopedia :
P :
PI :
PIO :
Pioneer Zephyr |
|
|
Pioneer Zephyr.The Pioneer Zephyr is a diesel-powered railroad trainset (a set of railroad cars permanently coupled together) built by the Budd Company in 1934 for the Chicago, Burlington and Quincy Railroad (CB&Q), commonly known by the shorter name of Burlington. The train, which featured extensive use of stainless steel, was originally named Zephyr and was meant as a promotional tool to advertise passenger rail service in the United States. The train's construction included innovations such as shotwelding (a specialized type of spot welding) to join the stainless steel, and articulation to reduce the train's weight. On May 26 1934, it set a speed record for travel time between Denver, Colorado and Chicago, Illinois when it made a 1,015-mile (1,633 km) non-stop "dawn-to-dusk" dash, covering the distance in 13 hours 5 minutes at an average speed of 77 mph (124 km/h). For one section of the run, the train reached a speed of 112.5 mph (181 km/h), just short of the then-world land speed record of 115 mph (185 km/h). The historic dash inspired two films and the train's nickname, "Silver Streak". The trainset entered regular revenue service on November 11 1934 between Kansas City, Missouri, Omaha and Lincoln, Nebraska. It was operated on this route until its retirement in 1960 when it was donated to the Museum of Science and Industry in Chicago where it remains on public display. The train is generally regarded as the first successful streamliner on American railroads. Concept and constructionIn the early 1930s, the U.S. was in the depths of the Great Depression. Without the money to purchase new goods, freight trains weren't hauling as much as they had in the previous decade. People who couldn't buy goods also couldn't afford to travel to the extent that they had before, so passenger revenues were also down. Even if they did have the money to travel, the equipment that railroads were using to carry passengers hadn't changed much since the middle of the 19th century. Railroads needed a way to re-energize the traveling public and offer a bit of hope for the days to come.
In 1932 Ralph Budd met Edward G. Budd (no relation), an automotive steel pioneer who was founder and president of the Budd Company. Edward Budd was demonstrating his new carbody construction in a prototype rail motorcar built of stainless steel. Stainless steel provided many benefits over traditional wood and hardened steel for railroad carbodies; it was a lighter and stronger material, and its natural silver appearance and resistance to corrosion meant that it wouldn't have to be painted to protect it from the weather. Since the carbody was much lighter than similar cars, it would be able to haul a higher revenue load for the same cost. The problem with building stainless steel cars was that nobody could find an adequate way to hold the body together, until the Budd Company patented the shotwelding technique. On August 20 1932, Earl J. Ragsdale, an engineer at the Budd Company, filed for a patent on "Method and product of electric welding"; on January 16 1934, the United States Patent and Trademark Office assigned to the Budd Company to cover the technique. Basically, because of the nature of stainless steel, traditional welding methods would unacceptably weaken the metal at the joint. In a shotweld, the two pieces of metal that are to be joined are pressed together at the joint with an electrode on each side of the joint. A very high current of electricity is passed through the joint which effectively fuses the two pieces of metal together.
The first Zephyr was completed by Budd Company on April 9, 1934, powered by an 8 cylinder, 600 horsepower (447 kW), 8-201-A model Winton Motor Company engine (the train's prime mover). Like the diesel-electric locomotives that would soon displace the steam locomotive on American railroads, this engine powered an electrical generator; the electricity it generated was then fed to electric traction motors connected to the axles in the train's front truck. The exterior design of the train was left to aeronautical engineer Albert Dean who designed the sloping nose shape, with architect John Harbeson and industrial designer Paul Philippe Cret devising a way to strengthen and beautify the sides with the train's horizontal fluting. section of the Pioneer Zephyr The Budd Company used the experience learned in building the Zephyr to build similar trains (such as the Flying Yankee) for other railroads, as well as a number of additional Zephyrs for the Burlington. Promotion: "Dawn-to-Dusk" dashTo catch the public's attention, however, this train wasn't simply rolled out of the factory for some dignitary to smash a bottle of champagne on its nose; it would make a dash from one end of the CB&Q, in Denver, to the other in Chicago. The railroad spared no expense in planning the operations. All other trains along the Zephyr's route were diverted to sidings and the turnouts were spiked into the proper alignment for the Zephyr's run. Track and maintenance of way workers checked every single spike and bolt along the train's route to ensure that there would not be any problems, and temporary speed signs were installed along the route to warn the Zephyr's driver of curves that would be dangerous at high speeds. On the day of the dash, every road grade crossing was manned by a flagman to stop automobile traffic ahead of the train and to ensure that the crossing was clear. Stations along the route were protected by local police officers and members of the American Legion and the Boy Scouts of America. The train left Denver at 7:04AM Central Daylight Time and arrived in Chicago at 8:09PM, a total of 13 hours and 5 minutes later, at an average speed of 77 mph (124 km/h). For one section of the run, the train reached a speed of 112.5 mph (181 km/h), just short of the then-world land speed record of 115 mph (185 km/h). The non-stop 1,015-mile (1,633 km) trip exceeded the railroad's expectations by making the run one hour and 55 minutes faster than was scheduled. Reporters along the route told of the "silver streak" that ran by faster than any other train that normally rode American rails at the time. The Burlington's contemporary passenger trains plied the same distance in around 25 hours. Riding the train for this run were Ralph Budd, Edward G. Budd, president H. L. Hamilton of the Winton Motor Company (at that time a part of the new General Motors Electro-Motive Division), a number of reporters, some Burlington employees, lucky members of the public, and Zeph, a burro that was contributed by a Colorado newspaper, the Rocky Mountain News, as a mascot for the train. The newspaper had described Zeph to the railroad as a "Rocky Mountain Canary" so the train's crew had originally planned only enough space for a birdcage; when they found out it wasn't a bird, the railroad hastily built a pen in the baggage section and bought some hay for it. When asked about the burro, Ralph Budd replied "Why not? One more jackass on this trip won't make a difference." After the train arrived in Chicago, it traveled a little farther to the 1934 Century of Progress fair (noted in some press articles about the dash as the "Chicago World's Fair") where it was put on public display on opening day. After its display on the Wings of a Century stage, the train was taken on a 31-state, 222-city publicity tour. More than 2 million people saw the train before it entered revenue service. Part of the tour included a test run between Chicago and Minneapolis-St. Paul that operated a full five hours faster than the Burlington's fastest steam-powered train along the same route. Due to the Zephyr's success on this test run, the Burlington immediately ordered two more Zephyr trainsets that would be dubbed the Twin Zephyrs; the new trains debuted in April 1935 on this route. Regular revenue serviceThe Zephyr's power (leading) car was numbered 9900, the baggage-coach combine car was numbered 505, and the coach-observation was numbered 570. The trainset was placed in regular service between Kansas City, Missouri, Omaha and Lincoln, Nebraska on November 11, 1934, replacing a pair of steam locomotives and six heavyweight passenger cars. The Zephyr replaced a train weighing up to eight times as much. By June 1935, it proved popular enough to add a fourth car to the train's regular configuration, providing additional coach seating. The fourth car was originally a 40-seat coach number 525, but the following June was switched to Twin Cities service, then back to the Pioneer Zephyr in December. Car 525 remained on the train until June 1938
On the second anniversary of the train's famous dash, the original Zephyr was rechristened as the Pioneer Zephyr to distinguish it as the first of the Burlington's growing Zephyr fleet. In 1938, car 525 was replaced with car number 500, a 40-seat buffet/lounge car to provide light meals during the train's travels. Car number 505, the baggage-coach combine, was also rebuilt at this time into a full baggage car, but it kept the windows as they were originally installed. In regular service, the Pioneer Zephyr had its share of accidents on the railroad. In 1939 it was involved in a head-on collision with a freight train that completely destroyed the trainset's control cab. The trainset was rebuilt and re-entered revenue service soon afterward, but the accident strengthened the opinions of locomotive designers to move the cab back from the front of the locomotive up above a large nose (as can be seen in the EMD F-unit and EMD E-unit series locomotives). Since the Pioneer Zephyr was built of stainless steel, which is not as recyclable as aluminum, the train was spared from the metal recycling drives of World War II. By contrast, Union Pacific's M-10000 was built of aluminum and was scrapped in 1942 for the war effort, among other reasons. By 1955 the Pioneer Zephyr's route had been updated to run between Galesburg, Illinois and St. Joseph, Missouri; the trainset had been in continual service since 1934, operating over nearly 3 million miles (4.8 million kilometres). The Pioneer Zephyr's last revenue run was a trip from Lincoln, Nebraska to Kansas City, Missouri (along the train's regular revenue route) that then continued to Chicago on March 20, 1960. When Amtrak took over passenger rail services in 1971, the legendary Zephyr name was preserved, and the California Zephyr is an Amtrak route in the 21st century. Use in filmPress publicity had apparently first coined the term "Silver Streak". The Pioneer Zephyr's famous Denver-Chicago dash served as the inspiration for the 1934 film Silver Streak starring Charles Starrett. In that story, the crew was racing to the Boulder Dam construction site with an iron lung, with only moments to spare. The original Zephyr trainset was used for the exterior shots in the film, while interior scenes were filmed on a soundstage in Hollywood. For the film, the "Burlington Route" nameplate on the train's nose was replaced with one that read "Silver Streak". More than 40 years later, that classic film – or at least the name "Silver Streak" – served as the inspiration for a newer film of the same name. Silver Streak (1976) starred Gene Wilder and Richard Pryor; rather than using the Pioneer Zephyr, the combination murder-mystery and comedy was set in the era in which it was filmed, with the train being patterned more after then modern long-distance trains. Legacy: Preservation and static display and namesakesOn May 26 1960, the 26th anniversary of the "Dawn-to-Dusk" dash, the original Pioneer Zephyr trainset (car numbers 9900, 505 and 570) was donated to the Chicago Museum of Science and Industry. Car number 500, which operated with the train starting in 1938, went along with Mark Twain Zephyr trainset 9903, to a party in Mount Pleasant, Iowa for static display in a town park, but plans for the train's display did not work out; car 500 and the Mark Twain Zephyr are currently stored in Chicago and plans are currently underway to display it in Fairfield, Iowa. The Chicago museum displayed the Pioneer Zephyr outside the museum, with no protection from the weather, until 1994. At that time, the steam locomotive that shared the display space with the Zephyr, Santa Fe #2903, was donated to the Illinois Railway Museum, while the Chicago museum prepared a new display location for the Zephyr. (rear) end of the Pioneer Zephyr as seen at the Chicago Museum of Science and Industry. Exterior projectors display moving images on the now frosted windows. Viewers inside the car see the rapid motion of passing landscapes and grade crossings and view simulated passengers displayed as talking animated mannequins In addition to the Pioneer Zephyr, two other legacies exist in modern time. An operable Nebraska Zephyr train was donated to the large Illinois Railway Museum at Union, west of Chicago. There, powered by one of the large "E" series passenger diesels (an EMD E5) with the distinctive and durable stainless-steel fluting, it is still operated on short runs on the Museum's substantial trackage, providing train enthusiasts and tourists with an experience reminiscent of the heyday of the Burlington's Zephyr service. The Ford Motor Company used the trade name "Zephyr" on a model of its Lincoln-Mercury division cars. Mercury Zephyrs were built in the 1970s and 1980s. Also utilizing the famous name, the Minnesota Zephyr is an elegant dining train located in the historic city of Stillwater, Minnesota, although it is not directly associated with the historic Burlington Zephyr fleet. Models of the Pioneer ZephyrDue to the Zephyr's place in American railroad history, many model railroaders have built their own versions of the Pioneer Zephyr in miniature. Several model manufacturers are now producing commercial ready-to-run models or kits of the train for modelers to build. This list is sorted by the manufacturer's release date:
|
|
|
This article is from Wikipedia. All text is available under the terms of the GNU Free Documentation License. |
|
| © 2008 Chamas Enterprises Inc. |